Upper Westside Kitchen

In this dramatic renovation adventure, we relocated the entire kitchen from one side to the other to create a more open floor plan.

location

Long Island City, NY

Date

June 20, 2024

Services

Residential Build Out

Share on

This extensive undertaking required us to cap the gas lines and switch to an electric stove. The design process took 2 months of planning before we began our demolition phase. The result is a stunning showcase of modern designs, featuring ultra high-end finishes.

This Project Involved
Crafting with Precision
Elegance Realized
Our gallery
Prev portfolio
Next portfolio